Khajrana flyover; One lane is 85 percent ready, lights are being installed
Indore | One lane of the flyover being built at Khajrana intersection is 85 percent ready. Lighting work is being started on this lane. At the same time, concrete approach (slope) is being done on both sides. Since Khajrana Ganesh temple is located near the bridge, murals of Lord Ashtavinayak in different postures will also […]