Facility • Travel on MR-10 will become easier due to Super Corridor, bridge on Indore-Ujjain road will be built by December

Indore.

One branch going from MR 10 to Super Corridor has been started at Lavkush crossing. The second branch coming from Super Corridor to MR-10 can be started from 6th January. On Sunday, IDA officers inspected the second branch. It has been closed for now by installing pipes on both sides. It can be opened on Monday evening. Like the second lane of Khajrana, there will be no inauguration program for this too. It will also be opened for traffic by chanting mantras.

You don’t have to stop at signals anymore

After the opening of both lanes of the double decker bridge, commuters from MR-10 to the super corridor will not have to stop at the + signal. More than 1 lakh drivers will save 10 to 15 minutes at the intersection every day.

Relief to dozens of colonies on both sides

People of Vijay Nagar, Ring Road, Scheme-78, dozens of colonies on the bypass side will not face any problem in going towards the airport. Traffic from MR-9 will be able to go towards Airport, Gandhi Nagar without stopping via Vijay Nagar, Sukhliya, MR-10 bridge. Traffic from the western part of the city will be able to come towards Vijay Nagar via this route. There will also be a road option between the two arms of the 650 meter long bridge. Drivers will also be able to go to the left and right side.

90% of traffic from AB Road, Vijay Nagar goes towards Ujjain via MR 10, there is no relief.

December 2025 at Lavkush Chauraha

Even after the bridges are ready, the problems of 90% of the vehicles going from MR 10 towards Ujjain will not end. Right now it takes 15-20 minutes to cross the crossing to go towards Uban. The service road here has become very narrow. The work of a double decker bridge going from Bananga to Ujjain is going on at this crossing. The condition of the road at the middle crossing is also very bad.

90% of traffic would have been towards Ujjain, there is no relief for him

* Those going towards Ujjain Road from the Super Corridor have to take the help of the village road behind the Aurobindo Hospital. Actually, the tar road at the intersection has become a kutcha road. When a truck stopped, the vehicles behind it got stuck. Vehicles coming from the truck go. Vehicles also go towards Banganga.

* Encroachment on service road, also on Ujjain Road’s service road

Encroachment is not less. Shopkeepers keep their parking and goods outside. Due to this also there is less space for vehicles to pass.

 

 

Leave a Reply

Your email address will not be published. Required fields are marked *