PWD has not yet finalized the planning of lighting format.

Sendul dividers will be built on the elevated bridge to be built between MR-9 intersection and Naulakha, so that traffic in both directions can pass safely and at an uninterrupted speed. Apart from this, there is no plan to build footpaths on the sides of the elevated bridge, because the construction of footpaths will reduce the width of the main road.

The width of the main road of the bridge between MR-9 to Naulakha will be 6.76 meters, while the length is 7.40 kilometers. Official sources say that making dividers is not only necessary for safety, it will also ensure that drivers do not take wrong turns. Since the bridge is being built in the middle of the BRTS corridor, pedestrians can easily pass under it. This is the reason why the need for footpath was not felt.

 

Leave a Reply

Your email address will not be published. Required fields are marked *